The process of flooring hardwood is a process that requires mastery. It is very important that the hardwood is designed by an engineer and that the millimeter measurements are taken. Engineered hardwood flooring provides the perfect hardwood flooring. There are no problems when flooring hardwood, and the hardwood parts are designed in harmony with each other and the process is completed.
After flooring the silt, the flooring process should be started with the female tenon facing the wall from the wall edge. A protective wedge should be used between the wall and the material. Glue should be applied to the inner parts of the female tenon of the part to be laid. After joining with the male tenon of the previous part, clamping should be performed with a wooden wedge without excessive force. The glue that overflows onto the surface should be wiped off with a clean cloth. Jul. The next row should start with the ascending part from the previous row, and the joining lines of the successive rows should be shifted by at least 50 cm. The plates must be thoroughly clamped with a lever. The wedges must be removed from the place, and the gap between the wall and the Flooring must be closed by flooring the skirting board.
Solid Hardwood Installation and Considerations
The solid hardwood you purchased is made of dried wood with modern systems. In order to get a good result during the flooring, the following points must be paid absolute attention to.
Before the application
Put your hardwood in the place to be laid at least 2 weeks before the date you intend to lay it. If your park is packed with nylon, take it out of the packaging by all means. Check the evenness of the floor on which hardwood flooring will be laid. Check the dryness of the hardwood floor. Do not lay your hardwood before the floor reaches the desired dryness ratio.
During the application
It is preferred that the ambient temperature to be applied to the hardwood is not less than 15 C. Glue your hardwood to the floor with solvent or polyurethane-based glue. Do not use water-based glue. After the flooring process is completed, do not perform the Cistercian and polishing process without waiting at least 2 weeks. Do not use nylon cover to protect the hardwood surface during this waiting period. The humidity of the Flooring to be used should be between 8-12. All plumbing should be reviewed, water leaks that occur for any reason should be absolutely eliminated. The biggest enemy of wood is moisture and direct water contact. Regardless of the type of floor chosen, the level of the floor must be the same at all points. The fact that the temperature of the environment where the hardwood will be laid is around 15 C is the preferred reason for the glue to freeze more easily and in a short time. Any repairs, plaster, stucco, etc., except for the final coat of paint. It should be ensured that there are no construction and decoration works such as. All joinery and window panes of the space where hardwood will be laid should be installed. If the floor on which hardwood will be applied is based on a screed, the screed should be at least 3 cm thick and dry. If you are hesitant about the dryness of the screed, have the screed moisture measured with a hygrometer. Hardening of the screed occurs within a few days. However, at least 30-45 days are needed, depending on seasonal conditions and other factors, to reach the dryness that can be applied directly to the hardwood. The hardwood applied on the screed, which does not dry well, absorbs moisture from the screed in a short time and swells as a result. In order for solid hardwoods to come to ambient humidity, they should be placed at least 10-15 days before the flooring process begins in the place to be laid, and if they are in nylon packaging, the packaging should be torn in several places. After the hardwood and flooring process is finished, do not perform the sistre and polishing procedures until at least 2-3 weeks have elapsed. Remember that wood is a living material and may show some slight movements, even if a little, depending on the humidity and temperature of the environment in which it is applied. If the cleaning and polishing process is performed immediately after the hardwood flooring process, the wood will adapt to the heat and humidity of the environment for a longer time, as the pores of the hardwood will be closed with emery powder and varnish, and if the ambient humidity is more than the hardwood humidity, there will probably be small concave collections on the hardwood surface.
Points to Consider on the Screed Floor You Will Hardwood Flooring
The screed should be poured quite tightly. By hitting the screed with a hammer and rubbing a substance with a sharpened nail-like tip on the screed, you can get information about the frequency and surface hardness of the floor. To obtain this homemade screed, the screed must not be lower than 400 doses. There should be no traces left when the surface of the screed is hit with a hammer, and deep traces and dust should not form when nail-like substances are rubbed on the screed. If the screed is excessively dusted, a primer should be used to cut off this dusting before applying the glue.
The screed should be sufficiently rested and dry. All types of cement-based screed should be rested for at least 30 days. The humidity in the screed should be controlled by descending to a depth of at least 2-3 cm from the surface. When measured with a GANN-type hygrometer, the maximum moisture value of a cement-based screed should be 25. Hardwood should definitely not be applied before the humidity drops to this value. The table above shows the approximate drying times of 400 doses of screed. However, these periods are absolutely non-binding and vary according to various factors such as relative humidity, heating and ventilation of the space, additives added to the screed. If hardwood should be laid before the humidity of the screed drops to the desired values, chemical isolation materials should be used to prevent absolute humidity.
There should be no cracks in the screed. Small cracks formed on the surface during the drying process of the screed are acceptable cracks. Apart from this, any cracks formed should be opened in a V-shape and filled with a mortar with synthetic resin additives added. There should be no excessive level difference on the screed. The floor on which the hardwood will be laid is sufficiently flat, without waves and should not show excessive level differences in itself.
Types of Hardwood Flooring
Hardwood floors have an endless variety of colors and patterns. Color and pattern selection should be made on the hardwood according to the characteristics and requirements of the place where the flooring will be applied.
Attention should also be paid to the integrity of criteria such as the volume of the room, its shape, the way it receives daylight and the ratio, the colors of the furniture in the area and the compatibility with other decoration elements.
Let’s take a look at the features that you need to pay attention to when choosing a hardwood pattern!
The Desired Effect to Be Created
The daylight entering the room must be evenly distributed over the floors in order to support the effect that the space needs and wants to be created. The direction and pattern of hardwood floors also change accordingly.
For example, in an area with a square shape, it would be appropriate to place the hardwood flooring in such a way that the direction is perpendicular to daylight. If it is in a volume with a rectangular form, then the hardwood plates should be laid parallel to the long side. In the same way, if we are trying to make our space look more spacious than it is, the hardwoods should be laid in the direction of the large area. All these are details that contribute to the visual aesthetics and the integrity of the space.
Common Forms of Hardwood Flooring
Although hardwood floors have a wide product range in terms of variety, there are some pattern alternatives that have been the most well-known and frequently preferred since the early days of hardwood. Although hardwood colors and patterns usually vary according to brands, the most common ones continue to be included in the catalogs with the name they are known by.
The work of flooring hardwood requires complete ingenuity. There are many subtleties for hardwood flooring, from the arrangement of the hardwoods to the shape to be given. For a hardwood flooring master, these are very easy. However, for someone who does not know the subtleties can damage the laminate, making the flooring work much more costly. For this reason, as a Canada / London hardwood company, we are at your service with qualified craftsmen and the most affordable hardwood prices. We are as close as a phone call to you.